Greater Changhua Offshore Wind Farm

OPERATOR

Greater Changhua Offshore Wind Farm

EPCI

LOCATION

Taiwan

EPCI CONTRACTOR

Van Ord / VLST

AEM SOW

Detail Design Engineering for HDD
The Greater Changhua Wind Farm is approx. 40km from the coastline. To transport power, export cables will be installed from the Wind Farm to shore via 3 800mm HDPE casings at the shore approach. These casings will be constructed using HDD. HDD engineering included;
- Casing driveability analysis, hammer analysis and selection.
- Critical buckling analysis for HDD reaming process.
- HDPE stability analysis at the shore approach, inc FEA and modeling.

FACILITIES

‐ HDD for 3 x 800mm HDPE

bottom of page