BP Tangguh Expansion Project Images courtesy of Borizontal
OPERATOR
BP Berau
EPCI
LOCATION
Bintuni Bay, Papua
EPCI CONTRACTOR
Lucas Engineering & Construction
AEM SOW
Detail Design Engineering for HDD :
The BP Tangguh Expansion Project (TEP) increases the current 2 LNG trains by additional train of 3.8 TCF via new offshore platforms and new 24-inch pipeline to the existing ORF. HDD engineering support SOW included;
- Work barge stinger design and associated fabrication details.
- Sheet pile anchor design and associated fabrication details, and Pull Back Assembly design.
- Drill pipe stability and recovery.
- Pipe stress analysis and other miscellaneous structural component design.
FACILITIES
‐ 24‐inch Offshore Pipeline to shore